1000 gpm (200 MMscfd) Amine Plant (New Surplus) LENGTH_18.43"200 MMSCFD Amine Gas Sweetening Plant New Surplus 1000 GPM Amine Regeneration Facility This surplus 200 MMSCFD Amine Gas Sweetening Plant was originally designed for large scale natural gas treating applications requiring acid gas removal and pipeline quality gas production. The facility includes a complete 1000 GPM amine regeneration system with major process vessels, filtration, heat recovery, cooling, pumping, and heat medium oil systems. Original
Manifold 2” FIG 1502 5 Plug Valve Dual Stage W/2 ADJUSTABLES-2 POSITIVES 15000 PSI STD SERVICE
Includes plug body and seat carrier assemblies
The PSV nozzle on the vessel is 3” 600#RF and piping reduced to 2” upstream of PSV-101
LAH-101 is wired to exterior mounted Junction Box with a two position hand switch to enable or overside & silence the visual red beacon and audible siren alarm
"H" STYLE - 2" 1502 SINGLE STAGE MANIFOLD
SWIVEL LONG RADIUS 4" FIG 1502 STYLE 20 SWIVEL MxF DET INTEGRAL 15000 PSI Standard SERVICE
Yes – (2) 1” 600# RF Nozzles c/w Tapped Hub Blind & 1” NPT 6M Ball Valve w/ Hex Plug
The compact body profile and hammer union end connections make the valve ideal for treating iron systems used in frac
3-1/8" 3M Adjustable Choke
Material: AA
SEAT ADAPTER FOR CHOKE 2” MAX X N60/FC140
MANIFOLD FRAME SKID - 2" 1502 - 9 PLUG VALVE SINGLE STAGE